Built (v0.2.5)
22features across 10 modulesTHE BIG PICTURE
Where CADS is going
The finished product on one page. Solid cards exist today, dashed cards are planned. Buttons on planned cards are placeholders.
Next 7 days (proposed)
04features across 10 modulesLater
18features across 10 modulesEvent register
Built (v0.2.5)Find any conjunction quickly, even when there are hundreds, and see what needs attention first.
Built (v0.2.5)
- Event cards with Active / Archived tabs
- Search, severity filter, needs-attention filter, sort
- Six events per page
- Archive and restore by hand
Next 7 days (proposed)
- Compact sidebar list beside the detail view for 180 or more events
Later
- Saved filters per user role
Operator and specialist views
Built (v0.2.5)Give the person on console three numbers and a sentence for a phone call, and give the specialist everything.
Built (v0.2.5)
- Operator view with an action label and a call summary
- Specialist view with detail, history and explanation
Later
- Views tied to user roles and organisations
Conjunction picture
Built (v0.2.5)Show the encounter so anyone can see why a number is high or low.
Built (v0.2.5)
- 2D picture of the closest approach with uncertainty clouds
Next 7 days (proposed)
- 3D view using the Earth scene from the landing page
Later
- Animation of the approach over time
CDM history and trends
Built (v0.2.5)Replace the spreadsheet tabs: see every update to an event and how the risk changed.
Built (v0.2.5)
- History table in time order
- Pc and miss-distance charts
- CDMs loaded one at a time, oldest first
Later
- Trend of uncertainty over time
Explanation and calculation details
Built (v0.2.5)Say in plain words how each number was reached, so the audience can trust or question it.
Built (v0.2.5)
- Plain-language explanation
- Miss distance against uncertainty
- Four-step calculation details
- Severity legend with where each limit comes from
Next 7 days (proposed)
- Check our Pc against NASA CARA test cases
Later
- Validated Pc agreed with CSA (reference method and tolerance)
Maneuver planning
LaterCompare ways to avoid a collision, always leaving the decision to a person.
Built (v0.2.5)
- Prototype study in the code, not yet on screen
Later
- Trade-space plots using CARA methods
- Compare burn options against the action level
Alerts and notifications
LaterTell the right people when an event crosses a limit, and keep a record of what was sent.
Built (v0.2.5)
- Alert rule engine in the code
- ACTION level flagged on cards
Later
- Rule editor
- Email and text delivery with retries
- Delivery log
Data sources
Built (v0.2.5)Bring CDMs in from files, synthetic datasets and, later, live services.
Built (v0.2.5)
- Bundled sample CDMs
- Load your own JSON or KVN files
- Generated test events for scale
Next 7 days (proposed)
- Load the larger synthetic dataset from CSA when it arrives
Later
- Space-Track or TraCSS adapter
- Data retention policy
Accounts, organisations and API
LaterLet each organisation see only its own satellites, and let other systems exchange data.
Later
- Sign-in and roles
- Organisation separation
- Documented API for events and proposed plans
Audit, quality and handover
LaterLeave CSA a system it can run, test and maintain.
Built (v0.2.5)
- Automated tests
- Release tags for each version
Later
- Audit trail of decisions
- Accessibility checks
- Install guide and handover documents
TIMELINE
Releases through Capstone Day
- R0Discovery and designFall 2026
- R1Fall MVPNov–Dec 2026
- R2Scientific and integrationJan–Feb 2027
- R3Integrated betaMar–Apr 2027
- R4Final handoverBy Apr 29, 2027
Releases follow Progress Report 1, section 6.2. Dates for R2 to R4 are indicative.