THE BIG PICTURE

Where CADS is going

The finished product on one page. Solid cards exist today, dashed cards are planned. Buttons on planned cards are placeholders.

Draft for discussion“Next 7 days” items are proposals for the team to confirm

Built (v0.2.5)

22features across 10 modules

Next 7 days (proposed)

04features across 10 modules

Later

18features across 10 modules

Event register

Built (v0.2.5)

Find any conjunction quickly, even when there are hundreds, and see what needs attention first.

Built (v0.2.5)

  • Event cards with Active / Archived tabs
  • Search, severity filter, needs-attention filter, sort
  • Six events per page
  • Archive and restore by hand

Next 7 days (proposed)

  • Compact sidebar list beside the detail view for 180 or more events

Later

  • Saved filters per user role

Operator and specialist views

Built (v0.2.5)

Give the person on console three numbers and a sentence for a phone call, and give the specialist everything.

Built (v0.2.5)

  • Operator view with an action label and a call summary
  • Specialist view with detail, history and explanation

Later

  • Views tied to user roles and organisations

Conjunction picture

Built (v0.2.5)

Show the encounter so anyone can see why a number is high or low.

Built (v0.2.5)

  • 2D picture of the closest approach with uncertainty clouds

Next 7 days (proposed)

  • 3D view using the Earth scene from the landing page

Later

  • Animation of the approach over time

CDM history and trends

Built (v0.2.5)

Replace the spreadsheet tabs: see every update to an event and how the risk changed.

Built (v0.2.5)

  • History table in time order
  • Pc and miss-distance charts
  • CDMs loaded one at a time, oldest first

Later

  • Trend of uncertainty over time

Explanation and calculation details

Built (v0.2.5)

Say in plain words how each number was reached, so the audience can trust or question it.

Built (v0.2.5)

  • Plain-language explanation
  • Miss distance against uncertainty
  • Four-step calculation details
  • Severity legend with where each limit comes from

Next 7 days (proposed)

  • Check our Pc against NASA CARA test cases

Later

  • Validated Pc agreed with CSA (reference method and tolerance)

Maneuver planning

Later

Compare ways to avoid a collision, always leaving the decision to a person.

Built (v0.2.5)

  • Prototype study in the code, not yet on screen

Later

  • Trade-space plots using CARA methods
  • Compare burn options against the action level
Release R2, R3

Alerts and notifications

Later

Tell the right people when an event crosses a limit, and keep a record of what was sent.

Built (v0.2.5)

  • Alert rule engine in the code
  • ACTION level flagged on cards

Later

  • Rule editor
  • Email and text delivery with retries
  • Delivery log
Release R1, R3

Data sources

Built (v0.2.5)

Bring CDMs in from files, synthetic datasets and, later, live services.

Built (v0.2.5)

  • Bundled sample CDMs
  • Load your own JSON or KVN files
  • Generated test events for scale

Next 7 days (proposed)

  • Load the larger synthetic dataset from CSA when it arrives

Later

  • Space-Track or TraCSS adapter
  • Data retention policy

Accounts, organisations and API

Later

Let each organisation see only its own satellites, and let other systems exchange data.

Later

  • Sign-in and roles
  • Organisation separation
  • Documented API for events and proposed plans
Release R2

Audit, quality and handover

Later

Leave CSA a system it can run, test and maintain.

Built (v0.2.5)

  • Automated tests
  • Release tags for each version

Later

  • Audit trail of decisions
  • Accessibility checks
  • Install guide and handover documents
Release R3, R4

TIMELINE

Releases through Capstone Day

Open the dashboard ↗
  1. R0Discovery and designFall 2026
  2. R1Fall MVPNov–Dec 2026
  3. R2Scientific and integrationJan–Feb 2027
  4. R3Integrated betaMar–Apr 2027
  5. R4Final handoverBy Apr 29, 2027

Releases follow Progress Report 1, section 6.2. Dates for R2 to R4 are indicative.